Your Position : Home > Application > Solutions > Power users >
 
 
Power users

Power users

 

  • Easy extension of current measurement location 
  • Interface with SCADA
  • Installation is simple since the electrical professional usually complete the test themselves
  • It is feasible to integrate the arc protection into the current protection system during improving the protection 
  • IEC61850, make the digital substation possible

     
 
SAQE-60 ARC
Main Unit SAQE-A200
     
 
Wireless temperature measu
China Mobile (Hohhot) data
Temperature rise explosion